presentations made easy
minimise your risks
Our Presentations are designed and delivered in a manner that aims to help you manage and reduce your risk of an impact with the underground services.
simplicity
The presentations are designed to be straight to the point and easy to understand with the help of visual aids using 3D modelling.
flexibility
You have the flexibility of choosing a presentation that suits your needs. There are a number of presentations on offer that cover various damage avoidance scenarios.
Delivery
All presentations are delivered (online or face to face) by professionals in the field of damage minimisation. All sessions have the latest damage prevention techniques.
Various presentations
You can tailor the presentation agenda to suit the need of yourself and your staff. Alternatively, you can attend a set agenda presentation (from the below menu)
Note:
1. Prices below are excluding GST.
2. Presentations that are face to face outside Sydney metro, have an additional cost of travel and accommodation (if required).
$139.05
Per person
- General Networks Awareness
- Online minimum of 1 attendee
- Face to Face minimum of 20 attendees
- Certificate of attendance
- Set delivery times
- 2 hrs duration
$180.25
Per person
- Damage Investigations
- Online minimum of 1 attendees
- Face to Face minimum of 10 attendees
- Certificate of attendees
- Set delivery times
- 2 hrs duration
$128.75
Per person
- Plan Awareness Session
- Online minimum of 1 attendees
- Face to Face minimum of 15 attendees
- Certificate of attendance
- Set delivery times
- 2 hrs duration
$139.05
Per person
- Duty of Care Awareness Session
- Online minimum of 1 attendees
- Face to Face minimum of 10 attendees
- Certificate of attendees
- Negotiable delivery times
- 2 hrs duration
Presentations explained
Networks awareness
It is a combination of the one call service and expert field experience in damages and damage minimisation.
Topics of discussion in general:
. Avoiding damage to underground and above-ground assets
∙ Asset owners plan response
∙ Onsite paper work requirements
∙ The Duty of care for planning
∙ Your obligations when working near vital assets
∙ The make and type of the network voids.
∙ Assets plan awareness.
Recommended audience up to 50 people.
Plan Awareness
The Plan Awareness presentation is an interactive session, designed in understanding:
• Various categories of assets & their owners in Australia
• The types of plans sent to the industry
• Supporting material that comes with the plans
• The importance of engagement
• Limitation of asset plans
• Requirements of the duty of care
damage investigation
Underground assets strikes occur on a daily basis across Australia. The need to properly investigate the incident in a timely manner is critical for future damage prevention, safety purposes and cost recovery
This 1.5 hours seminar covers the basics requirements on a damaged site, which include:
Focus on the breach of the duty of care that resulted in the underground strike
The processes and procedures involved in locating and protecting the underground assets before a damage
The breaches of the duty of Care
Working Safely once an underground strike occurs
Involvement of the staff onsite during a damage investigation
Three main pillars of underground damage investigation that is common to all damage locations
duty of care
The Duty of Care is a 2 hours presentation solely focusing on the 6Ps and how they should be implemented.
· 6Ps (Plan, Prepare, Pothole, Protect, Proceed and Plot)
Link to Design awareness and utility strike avoidance2
Frequently asked questions
The duty of care is what the entire industry must do to protect the underground services. This is discussed in details in the Duty of Care presentation.
In our presentations we talk about why services end up with various depth of cover.
Your liability will be weighed against what duty of care was taken. This is discussed in the Networking Working Awareness presentation.
The biggest mistake made by the industry, that major networks can not run across their property. In the telecommunication presentation this is discussed in detail.
The asset plans should be in the hands of the planner, project manager and the machine operator. This is discussed in details in the Plan Awareness Presentation.
Any plan can be drawn incorrectly, or missing assets. This is highlighted in the Plan Awareness Presentation.
On an confirmation sheet provided by One Call, or going to the asset owner’s offices. This is discussed in the Plan Awareness presentation.
All the current asset plans provided by the asset owners. The paper work requirements, are discussed in the Network Awareness Presentation.
All presentation course material are subjected to copyright. If you would like more information or would like to purchase any course material – Contact Us